Client: Shell
Date: 2012
Project: Pinkenba Terminal Tank and pipe removal
Scope: Site preparation and removal of redundant diesel oil tanks. Removal of pipe spools and valves, asbestos gaskets and redundant pipe supports. Work included installation of new Tie in lines, pipe spool installation at heights and transport of oversize loads.
Client: Incitec Pivot
Date: 2011/2012
Project: 3rd HHE Compressor project
Scope: Work shop pre fabrication and on site installation of pipe work. Extensive site installation and rectification of ammonia and urea lines inside operating facility. Work included new tie in lines, new valves, pipe supports and tracers. Work included 24 hour rotating shifts and shut down work.
Client: Origin Energy
Date: 2012
Project: Tallinga Energy Hot Bypass
Scope: Site installation of pre fabricated gas pipe work.
Client: Shell
Date: 2012
Project: Pinkenba Terminal Tank and pipe removal
Scope: Site preparation and removal of redundant diesel oil tanks. Removal of pipe spools and valves, asbestos gaskets and oversize loads.
Client: Caltex
Date: 2012
Project: Lytton refinery Pump bay Tie ins
Scope: Work shop pre fabrication and on site installation of pipe work, Installation of new supports and pipe line and valves for new facility.
Client: RAAF Base Amberley
Date: 2011/2012
Project: Jet Fuel pump bay
Scope: Work shop pre fabrication and on site installation of pipe work, site fabrication of vertical storage tanks and associated piping. Rectification and removal of jet fuel pumping station and associated piping.
Client: Enerflex Process
Date: 2011/2012
Project: QGC TEG Dehydration Units
Scope: Work shop fabrication of gas pipe work and installation of piping on skids.
Client: BP Bitumen
Date: 2011/2012
Project: Verticle storage Tank Repairs & Piping Modifications
Scope: Pre fabrication of pipe spools & site installation. Rectification and fabrication of Tank roof and floor sheets, installation of valves and hot oil lines, tank cleaning, sandblasting and painting.
Client: Enerflex Process
Date: 2011
Project: Epic Energy Wallumbilla QSN3 Compressor Expansion
Scope: Workshop fabrication of carbon and stainless steel pipe spools.
Client: Clough CSG
Date: 2011
Project: Arrow Energy Moranbah Gas Plant - Node 2 Expansion
Scope: Workshop fabrication of pipe work and installation of piping.
Client: QGC
Date: 2011
Project: Well Head Gas Separator Skid Modifications
Scope: Modification and rectification of well head separators, piping & skids. Works included extensive repairs and confined space work.
Client: Syntech Resources
Date: 2010
Project: Cameby Downs Coal Mine
Scope: Pre fabrication pipe spools and installation of structural steel, conveyors, pumps and piping.
Client: Luggage Point Alliance
Date: 2009
Project: Luggage Point Advance Water Treatment Plant
Scope: Pre fabrication stainless steel pipe spools & site installation.
Client: QGC
Date: 2009
Project: Kenya Compressor Station Expansion
Scope: Work shop pre fabrication of pipe spools.