    Client: Shell
    Date: 2012
    Project: Pinkenba Terminal Tank and pipe removal
    Scope: Site preparation and removal of redundant diesel oil tanks. Removal of pipe spools and valves, asbestos gaskets and redundant pipe supports. Work included installation of new Tie in lines, pipe spool installation at heights and transport of oversize loads.

    Client: Incitec Pivot
    Date: 2011/2012
    Project: 3rd HHE Compressor project
    Scope: Work shop pre fabrication and on site installation of pipe work. Extensive site installation and rectification of ammonia and urea lines inside operating facility. Work included new tie in lines, new valves, pipe supports and tracers. Work included 24 hour rotating shifts and shut down work.

    Client: Origin Energy
    Date: 2012
    Project: Tallinga Energy Hot Bypass
    Scope: Site installation of pre fabricated gas pipe work.

    Client: Shell
    Date: 2012
    Project: Pinkenba Terminal Tank and pipe removal
    Scope: Site preparation and removal of redundant diesel oil tanks. Removal of pipe spools and valves, asbestos gaskets and oversize loads.

    Client: Caltex
    Date: 2012
    Project: Lytton refinery Pump bay Tie ins
    Scope: Work shop pre fabrication and on site installation of pipe work, Installation of new supports and pipe line and valves for new facility.

    Client: RAAF Base Amberley
    Date: 2011/2012
    Project: Jet Fuel pump bay
    Scope: Work shop pre fabrication and on site installation of pipe work, site fabrication of vertical storage tanks and associated piping. Rectification and removal of jet fuel pumping station and associated piping.

    Client: Enerflex Process
    Date: 2011/2012
    Project: QGC TEG Dehydration Units
    Scope: Work shop fabrication of gas pipe work and installation of piping on skids.

    Client: BP Bitumen
    Date: 2011/2012
    Project: Verticle storage Tank Repairs & Piping Modifications
    Scope: Pre fabrication of pipe spools & site installation. Rectification and fabrication of Tank roof and floor sheets, installation of valves and hot oil lines, tank cleaning, sandblasting and painting.

    Client: Enerflex Process
    Date: 2011
    Project: Epic Energy Wallumbilla QSN3 Compressor Expansion
    Scope: Workshop fabrication of carbon and stainless steel pipe spools.

    Client: Clough CSG
    Date: 2011
    Project: Arrow Energy Moranbah Gas Plant - Node 2 Expansion
    Scope: Workshop fabrication of pipe work and installation of piping.

    Client: QGC
    Date: 2011
    Project: Well Head Gas Separator Skid Modifications
    Scope: Modification and rectification of well head separators, piping & skids. Works included extensive repairs and confined space work.

    Client: Syntech Resources
    Date: 2010
    Project: Cameby Downs Coal Mine
    Scope: Pre fabrication pipe spools and installation of structural steel, conveyors, pumps and piping.

    Client: Luggage Point Alliance
    Date: 2009
    Project: Luggage Point Advance Water Treatment Plant
    Scope: Pre fabrication stainless steel pipe spools & site installation.

    Client: QGC
    Date: 2009
    Project: Kenya Compressor Station Expansion
    Scope: Work shop pre fabrication of pipe spools.